首頁 > 網路資源 > 大同大學數位論文系統

Title page for etd-0714109-151235


URN etd-0714109-151235 Statistics This thesis had been viewed 1804 times. Download 4 times.
Author Sheng-Min Huang
Author's Email Address No Public.
Department Management Business Administration
Year 2008 Semester 2
Degree Master Type of Document Master's Thesis
Language Chinese&English Page Count 177
Title PRODUCTION POLICY UNDER REWORKING OF IMPERFECT QUALITY ITEMS, TRADE CREDIT, AND PARTIAL BACKLOGGING
Keyword
  • optimal
  • partial backlogging
  • trade credit
  • imperfect quality items
  • reworking
  • reworking
  • imperfect quality items
  • trade credit
  • partial backlogging
  • optimal
  • Abstract Improving the production efficiency in order to reduce the total cost is an aim that most manufacturers pursue actively. In reality, trade credit, reworking of imperfect quality items and partial backlogging exist side by side and affect the manufacturers’ costs. This paper studies the production policy under trade credit, reworking of imperfect quality items, and partial backlogging. In model 1, we consider trade credit and reworking of imperfect quality items into the production policy; afterward, we extend model 1 to consider partial backlogging and then establish model 2. We determine the optimal production lot size and maximum backorder level to minimize the total cost. This paper extends the traditional EPQ model by considering trade credit, reworking of imperfect quality items, and partial backlogging to cope with more realistic situation. We develop algorithms to solve the problem described. Finally, we use numerical example to explain process of solution and present the conclusion.
    Advisor Committee
  • Yu-Chung Tsao - advisor
  • Kun-Huang Yeh - co-chair
  • Lu-Wen Liao - co-chair
  • Files indicate not accessible
    Date of Defense 2009-06-25 Date of Submission 2009-07-14


    Browse | Search All Available ETDs